Estimate the total cost and timeline for your boat building project.
"My Boat Plans" is a collection of over 500 boat plans, from simple dinghies to larger cruisers. It includes step-by-step guides, video tutorials, and more.
Download NowA boat-building budget is where enthusiasm meets invoice. Most DIY projects finish, but many finish over budget and later than planned because the real cost of timber, hardware, resin, paint, and the hundred small consumables was guessed at the kitchen table rather than estimated deliberately.
This calculator starts from a proven cost-per-foot figure for your construction type — plywood, strip-plank, composite, or traditional carvel — then layers in materials, hardware, propulsion, rigging, and finishing, and adds a healthy 20% contingency because there is always something you did not expect.
It also estimates a realistic timeline in months from the boat's length and divides the budget to give a monthly spend, so you can plan the project against your cash flow and your calendar rather than both being surprises.
Base cost = length × cost-per-foot; Final = (subtotals) × 1.20| Construction type | Base $/ft | Notes |
|---|---|---|
| Plywood (stitch & glue) | ~$800 | Cheapest, fastest, forgiving |
| Strip-plank / cedar-epoxy | ~$1,100 | More labour, beautiful finish |
| Cold-moulded | ~$1,300 | Multi-layer, skilled planking |
| Traditional carvel | ~$1,600 | Most labour and hardware |
| Composite / fibreglass | ~$1,400 | Mould, resin, and core costs |
Illustrative base cost-per-foot for materials-heavy stages (2026 US, before contingency).
Formula verified against standard naval-architecture references · Updated October 2026
For materials and hardware, a realistic planning range is roughly $700 to $1,600 per foot depending on construction type, with plywood stitch-and-glue at the low end and traditional carvel or composite at the high end. Add propulsion, which can run from a couple of thousand for a small outboard to many thousands for an inboard diesel. A 20 ft plywood boat commonly lands near $20,000 to $25,000 all-in before contingency.
Buying a production boat is usually cheaper in pure dollars because you are not paying for your own labour at anything close to its opportunity cost, and factories buy materials wholesale. Building can be cheaper in materials terms and always buys more boat per dollar if you value your time modestly, but the honest savings come from the satisfaction, the exact-spec result, and the skills — not from beating a factory on price.
Because marine projects are full of surprises: material prices move between planning and purchase, mistakes need redoing, a critical component arrives wrong, and hidden items like trailering, storage, insurance, and tools appear late. A 20% buffer turns those from a stalled project into an absorbed cost. Experienced builders often quietly wish they had used 30%.
As a rough guide a part-time builder spends one to three years on a small to mid-size boat, scaling with length and construction complexity. This calculator estimates months as length × 1.5 clamped between 6 and 36 to reflect that planning, not hammering, is the long pole. Strip-plank, cold-moulded, and finishing stages stretch timelines more than anyone expects.
Finishing consumables (sandpaper, brushes, tape, solvents), hardware you only discover at the last minute (steering, deck fittings, electronics), the trailer or dolly, mooring or storage fees during the build, insurance, and the launch and registration. Propulsion rigging and control cabling also routinely add more than the engine price alone. Build these into the categories rather than treating them as extras.
A well-executed DIY boat is often worth less on the used market than the sum of its materials and hours, because buyers discount unknown construction and cannot verify workmanship the way a brand-name hull is valued. The financial return is normally in enjoyment and capability, not resale. Use the resale-value calculator to see a realistic later figure before you commit.
Price every major item before you start and lock the spec, buy materials in one planned order to catch price and quantity breaks, keep a running spreadsheet against each category, and protect the contingency. Most overruns come from mid-build upgrades and from under-budgeting finishing and propulsion, so freeze those decisions early and resist scope creep.